Dublin Bay Project – Contract No.2

Ringsend Wastewater Treatment Plant DBO

T.J. O’Connor & Associates acted as Civil/Structural Consultants for the ABA (Ascon, Black & Veatch, Anglian) joint venture to Design, Build and Operate an upgraded wastewater treatment plant in Ringsend which serves the greater Dublin area as part of the overall Dublin Bay Project. The design involved the upgrading of the existing treatment plant to cater for a design population of 1.64 million with a full flow to treatment of 11.1m³/s and a peak flow of 22.6m³/s. Some of the physical constraints were that the site was less than 15 hectares which is unusually small for a plant of this capacity and also that part of the plant was built on an old refuse site.

T J O’Connor & Associates were responsible for the civil and structural design which included over 15km of pipeline ranging from 0.1m up to 2.1m diameter, new inlet works and associated building, primary tanks, storm tank refurbishment, sludge building, CHP building, sludge digesters, gas holder, SBR tanks, UV disinfection and associated building, new roofs on existing admin and workshop buildings and numerous other elements and site works. 

Some of the unique features of the constrained site included the largest Sequencing Batch Reactors (SBR) ever built. This was the first time a 2 level SBR system has been built in Europe and over 4000 piles were used in its construction. The plant also contained the largest sludge hydrolysis plant ever built. Another feature was that there was a requirement to maintain continuous flow of the various existing wastewater streams coming into the old plant whilst demolishing the old plant in a phased manner and building the new structures within the contract time allowed. An example of this was the existing primary treatment tanks which were upgraded and replaced with new primary treatment elements one by one while flow was maintained to adjacent tanks.

Start/End Date:

1999 – March 2004

Contract Value:

€200M

Role:

Civil & Structural Consulting Engineers

Key Features:

 