Get In Touch

Corrig House, Corrig Road, Sandyford, Dublin 18

+353 (0)1 295 2321 tjoc@tjoc.ie

Suite D, Penrose House, Penrose Quay, Cork

+353 (0)21 450 2522 cork@tjoc.ie

 

SIOBHÁN MONELEY

Present Position:Siobhán Moneley

Associate

Education:

  • BE (Civil) University College Galway 1996
  • MSc in Civil Engineering Queen’s University, Belfast 1997
  • DIT Post-Graduate Certificate in BIM Technologies 2016

Professional Qualifications:

  • Chartered Member of the Institution of Engineers of Ireland 2005

Experience:

Siobhán is an Associate at the company and the company BIM Manager and is responsible for the implementation and use of Building Information Modelling (BIM) in the firm. This includes implementing the use of BIM software i.e. Revit, Tekla Structures, Navisworks, Windes MicroDrainage and AutoCAD Civils 3D, procuring Point Cloud Surveys and BIM Modelling Works and developing and implementing BIM Processes and documentation within the firm and on associated projects. These project currently include Ringsend Wastewater Treatment Plant Upgrade Project, Cork and Galway University Hospital Radiation Oncology Centres and Office Block developments at Nos. 3009 & 3011 Lakedrive, Citywest. She is currently completing a Post-Graduate Diploma in Collaborative BIM at DIT College, Dublin.

Since joining T. J. O’Connor & Associates in 2000, Siobhan has also gained extensive experience in all aspects of the preparation for and execution of civil and structural engineering projects, including preliminary and detailed structural design, preparation of tender and construction packages, attending project team and site meetings and the day-to-day management and site monitoring of projects. Some of the major projects she has been involved in include Dundrum Town Centre Development, Phases 1 and 2, Carrickmacross Sewerage Scheme, Mallow/Ballyviniter Water Supply Scheme and Castleknock Hotel and Country Club.

She has been responsible for compiling design, tender and contract documentation and drawings for a variety of local authority projects and has experience in completing local authority and government department applications including Foreshore Licence, Part VII planning and Discharge Licence Applications. She has gained experience in Sustainable Urban Drainage Systems and is responsible for compiling Sustainable Urban Drainage Strategy Reports for a number of projects.